Custom tiled walk-in shower remodel in Oklahoma City

Shower Remodels & Tub-to-Shower Conversions in Oklahoma City

Old tubs and leaking showers torn down to the studs, upgraded with 2" DWV drain lines, 100% waterproofed with Schluter-KERDI, and rebuilt in custom tile in 4–7 days ($7,500–$13,500). One owner-led crew serving OKC, Edmond, and the metro.

Timeline4–7 working days
Pricing bracket$7,500 – $13,500
Plumbing upgrade2" DWV high-flow drain
WaterproofingSchluter-KERDI lifetime

Bathroom Work Built Around Prep

The visible finish only holds when the prep behind it is right. Custom showers and full bathroom remodels are the core of the work — with tile floors, backsplashes, and finish details handled on projects that call for it.

01

Full bathroom tear-outs

Bathrooms opened up when needed so framing, moisture damage, plumbing, electrical coordination, drywall, waterproofing, and finish work happen in the right order.

02

Custom tile showers

Walk-in showers with proper slope, waterproofing, niches, benches, linear drains, and clean glass-ready edges.

03

Bathroom floors and tile details

Porcelain, travertine, marble, slate, herringbone, chevron, mosaics, and bathroom floors set with careful prep so edges stay even.

04

Tub-to-shower conversions

Fiberglass tub and shower removals rebuilt as tiled walk-in showers with proper drain planning, waterproofing, and glass-ready openings.

05

Waterproofing and substrate repair

Drywall repair, floor flattening, uncoupling mats, waterproofing, trim coordination, and behind-the-wall fixes that keep the finished project from failing.

06

Custom tile & backsplash artistry

Kitchen backsplashes, feature walls, trim transitions, and other tile details handled as a premium secondary lane when they fit the project.

Finished Shower & Tile Work

A look at showers, bathroom floors, backsplashes, and accent work. The details that matter are the straight lines, clean transitions, and prep you do not see once the tile is finished.

See the work before you call

These are real jobs — not staged, not stock. Bathroom remodels, custom showers, and tile work filmed on-site so you know exactly what to expect.

Recent bathroom remodel

Full bathroom gut and rebuild — custom tile, waterproofing, and finish work from start to done.

Open video

Custom shower build

Zero-entry custom shower with precision substrate prep and large-format tile set perfectly plumb.

Open video

Detail and finish work

The cuts, the grout lines, the transitions — this is what separates clean tile work from average.

Open video

Oklahoma City and Lawton

Parsons handles bathroom remodels, custom tile showers, tub conversions, and finish tile work across OKC and southwest Oklahoma. If you're in the area, reach out — most projects can be scoped in one visit.

OK
Oklahoma City
Lawton
Elgin
Cache
Medicine Park
Geronimo
Fletcher
Duncan
Altus

Based in Choctaw with regular work throughout Lawton and the surrounding southwest Oklahoma towns. Call to confirm availability for your area.

Preview Materials Before You Commit

Compare shower, bathroom, and accent tile options before the first site visit. Each material is matched to the rooms where it makes sense for water exposure, slip resistance, and finish.

Custom Walk-in Shower (Walls) visualizer
Custom Walk-in Shower (Walls)Calacatta Gold Marble
Select installation zone
Select material

Calacatta Gold Marble

Natural Marble

White marble with gray movement and warm veining. Best used where the stone can be sealed and maintained properly.

Material cost
★★★★★
DCOF safety rating
Low (< 0.42) — Walls Only
Thickness profile
3/8" (9.5mm)
Suggested grout
Laticrete Bright White (#44) / 1/16" spacing
Recommended trim
Brushed Brass Schluter Jolly

Material choice depends on where the tile is going. Wet floors, shower walls, and backsplashes do not need the same surface, grout, or trim.

Bathroom Project Estimate

Get a clear bathroom project estimate

Pick the bathroom size, finish level, structural changes, timeline, and ZIP code. Donnie uses the details to spot likely cost drivers before he puts a formal number on the work.

Upload photos or a competitor quote

Optional. Photos make the report more useful.

No files selected yet.

Estimated project range

$20,100 - $26,400

Estimate basis: $22,800

This is a preliminary project estimate, not a final bid. It uses your selected bathroom type, finish level, structural changes, timeline, and local ZIP context.

Budget fitLikely
MarketStandard
PhotosNo
Full Hall Bath$14,500

55 sq. ft. estimate size. Final measurements can move this up or down.

Convert Tub to Walk-In Shower$4,200

Remove tub or insert, rebuild the opening, plan slope, drain, waterproofing, and glass.

Waterproofing, prep, and finish repair$2,400

Allowance for behind-the-wall prep, membrane detail, drywall repair, trim, and finish touchups.

Field condition buffer$1,688

Allowance for hidden damage, access issues, framing correction, and site conditions.

Step 5: Send Your Estimate Request

Send the details to Donnie for a fit check. Qualified projects can move toward a site measurement; smaller cosmetic repairs still get a clearer expectation before anyone wastes time.

What Keeps Tile Work From Failing

A beautiful tile job is only useful if the structure beneath it is sound. I use waterproofing methods and careful layout work so showers and floors last for years.

Mitered marble shower niche detail

Schluter waterproofing system

Waterproofing behind the tile

I use complete Schluter systems including Kerdi board, Kerdi band, and Kerdi shower trays. The goal is simple: keep water where it belongs before the finished tile ever goes up.

Leveling clips that prevent lippage

Flatter finished surfaces

Large tiles can cup slightly in the kiln. If they go on an uneven floor, the edges stick up. I use leveling systems and floor prep so the finished surface feels clean underfoot.

Epoxy and urethane grout options

Cleaner joints with less upkeep

Cement grout can absorb water and stain over time. On the right projects, I use Laticrete Spectralock epoxy or urethane grout so the joints are easier to clean and maintain.

Miters and finished edges

Edges that look intentional

I do not use cheap metal or plastic trim to finish custom niches. I hand grind and miter corner joints on raw stone at a forty-five-degree angle, or polish the tile edge itself. It takes longer, but the result is clean.

Finished Parsons bathroom remodel

Bathroom Work, Finished by Hand

Previously known online as Parsons Stone & Tile.

For more than twenty years, I have built my business one project at a time, mostly through word of mouth. I am based in Choctaw now, but Lawton is still home ground, so I keep taking custom shower and bathroom projects there and across southwest Oklahoma.

Bathrooms usually need more than new tile. I tear out old work when needed, look for damage, and coordinate the plumbing or electrical pieces before closing the walls back up. Then I handle the waterproofing, drywall repair, tile, paint touchups, trim, and finish details so the room goes back together correctly.

“The finish only looks good if the work behind it is right. I would rather open it up, fix the problem, and put it back together clean.”

Over twenty years serving Oklahoma homeowners
Schluter Certified Installer
Custom showers and bathroom remodels
Fully insured local business
20+Years Experience
250+Custom Showers Built
StudsBathroom Tear-Outs

Let’s Discuss Your Bathroom Project

Share your project and contact info. If it looks like a fit, you’ll hear back to schedule a site visit at your project address in the Oklahoma City metro or Lawton.

(405) 455-9575Donnie@okcbath.comView our Google Business ProfileBased in Choctaw, serving the Oklahoma City metro and select southwest Oklahoma projects.Mon–Fri: 8am – 6pm
Used for calls about your project.