OKC Tub-to-Walk-In Shower Specialist

Tub-to-Shower Conversions in Oklahoma City

If the old tub or fiberglass insert is dated, cramped, or failing, Donnie can open the space up and rebuild it as a tiled walk-in shower with proper waterproofing, slope, trim, and glass-ready edges.

Drain Conversion2" DWV High-Flow
WaterproofingSchluter-KERDI
Quality Check24-Hr Flood Test
Curb & Niche CapsSolid Quartz Slab
(580) 919-1294
Custom Walk-In Tile Shower Conversion in Oklahoma City
Real Custom Tile vs. Plastic Acrylic Inserts

Studs-out conversion built for a lifetime of daily use

No franchise markups, no plastic wall shells, no trapped mold. Custom mortar bed pre-slope & Schluter-KERDI vapor barrier.

Engineering Excellence

The 5-Stage Tub-to-Shower Conversion Process

Converting a tub alcove into a custom walk-in shower requires strict compliance with TCNA standards and plumbing codes. Here is how Donnie builds every shower from the framing forward.

STEP 01 OF 05Technical Specification

Tear-Out & 2" DWV Drain Conversion

We strip the space to bare studs and subfloor, inspecting for hidden water damage or bad framing. Standard tub drains use 1.5-inch piping. Code and performance require upgrading to a 2-inch PVC/ABS DWV drain line so high-flow showerheads drain instantly without backup.

Trade Standard ComplianceTCNA Standard: 2-inch minimum drain diameter for shower pans; plumbing rough-in at 80" for valve height.
Truth in Remodeling

Custom Tile vs. Franchise Acrylic Overlays

Many OKC homeowners are quoted $15,000 to $22,000 by national franchises for quick 1-day acrylic tub overlays. Compare the engineering behind a real custom tile conversion versus a plastic shell.

Specification FactorParsons Custom Tile ConversionNational Franchise Acrylic Overlay
Waterproofing Integrity
Schluter-KERDI 100% vapor-impermeable membrane sealed from studs to ceiling
Unsealed plastic panels glued over old drywall; traps moisture & mold behind shell
Plumbing & Drain Line
Full 2-inch DWV high-flow shower drain conversion to handle high volume
Forces connection to restrictive 1.5-inch tub drain; prone to pooling and backup
Niches & Seating
Custom recessed studs-out niches & benches capped with single-piece stone
Glue-on plastic corner caddies that yellow, crack, and break off over time
Door & Glass Prep
Laser-plumbed walls for seamless frameless heavy glass enclosure installation
Requires bulky aluminum tracks with rubber sweeps to cover out-of-plumb walls
Home Appraisal & Equity
Adds permanent custom home appraisal value & buyer appeal
Viewed by appraisers & buyers as a cheap temporary cover-up
Long-Term Warranty
Lifetime warranty on waterproofing when installed from studs out by Donnie
Limited prorated surface warranties with exclusions for discoloration or seals
Before You Sign a High-Pressure Contract

Got a $15,000+ Franchise Quote? Get a Confidential Second Opinion

National bath franchises train high-pressure salesmen to close $15,000–$25,000 acrylic tub covers on the first visit. Share your quote details with Donnie. He will tell you exactly what you are paying for and whether a real custom tile shower can be built for a comparable investment.

No high-pressure sales pitches or persistent call centers
Transparent line-item breakdown of materials vs labor
Direct owner review by Donnie Parsons
Request Quote Second Opinion
Bathroom Project Estimate

Get a clear bathroom project estimate

Pick the bathroom size, finish level, structural changes, timeline, and ZIP code. Donnie uses the details to spot likely cost drivers before he puts a formal number on the work.

Upload photos or a competitor quote

Optional. Photos make the report more useful.

No files selected yet.

Estimated project range

$20,100 - $26,400

Estimate basis: $22,800

This is a preliminary project estimate, not a final bid. It uses your selected bathroom type, finish level, structural changes, timeline, and local ZIP context.

Budget fitLikely
MarketStandard
PhotosNo
Full Hall Bath$14,500

55 sq. ft. estimate size. Final measurements can move this up or down.

Convert Tub to Walk-In Shower$4,200

Remove tub or insert, rebuild the opening, plan slope, drain, waterproofing, and glass.

Waterproofing, prep, and finish repair$2,400

Allowance for behind-the-wall prep, membrane detail, drywall repair, trim, and finish touchups.

Field condition buffer$1,688

Allowance for hidden damage, access issues, framing correction, and site conditions.

Step 5: Send Your Estimate Request

Send the details to Donnie for a fit check. Qualified projects can move toward a site measurement; smaller cosmetic repairs still get a clearer expectation before anyone wastes time.

More than swapping a surface

A real tub-to-shower conversion may involve drain planning, framing changes, waterproofing, shower pan work, tile layout, and glass coordination. Those pieces need to be solved before the finish choices take over.

Built for daily use

The goal is a shower that feels easier to step into, easier to clean, and better suited to the way the bathroom is used every day.

Frequently Asked Questions (Tub-to-Shower Conversions)

Yes. Donnie can remove the old tub or insert, inspect the framing and drain situation, and rebuild the area as a tiled walk-in shower when the home is a fit.
The Parsons Guarantee

Why OKC Homeowners Choose Donnie

  • 2" DWV High-Flow Drain Line Conversion
  • Schluter-KERDI Waterproofing & 24-Hr Flood Test
  • Single-Piece Quartz Curb & Niche Thresholds
  • Stain-Resistant Epoxy & Silicone Movement Joints
Service Metro AreaOklahoma City, Edmond, Nichols Hills, Yukon, Mustang, Moore & Lawton
Request Bid

Let’s Discuss Your Bathroom Project

Share your project and contact info. If it looks like a fit, you’ll hear back to schedule a site visit in Oklahoma City or Lawton.

Used for calls about your project.